Repairs....complete with added expenses.  These seem to really add up when I think about what we've had worked on (or done ourselves), on this old farmhouse in the last 5 years.

We had a leak above our bedroom, from what we thought was the toilet wax seal leaking in the 2nd floor bathroom.  One night, Jeremy used the sink and that's when we realized that the leak was only when water was draining from the sink.  By that time, the drywall/ceiling had crumbled away in a small hole, and the water could drip unimpeded right down, through insulation and drywall, to the carpet below.  If it splashed at all, the splatters hit the edge of my pillow.  
Time for some action.

A handyman had been out last week with his brother to take out the French doors in the kitchen and replace them with beautiful but sensible sliding glass doors.  We called him again.  Insurance grudgingly sent someone out and then sent us a check, so we had a little money to work with (after the deductible, of course).

Jim took off a bit of drywall in the beginning stages of this newest project, and found that the leak was coming from the cast iron pipe where the sink drain met the larger pipe and where both were in contact with the floorboards of the bathroom, all of which was encased in and above the ceiling of our room...

Here is where the plumbers entered the scene. 
Because the repairs now had to do with an ancient cast iron pipe that ran the length of our ceiling (under the tub, toilet, and sink upstairs) and also up from bathroom to the vent in the room, we had to hire plumbers.  They would remove the pipe (which had been badly patched in other spots) but it was so heavy that they needed to cut it into manageable sections.  PVC pipe would replace it before the ceiling and walls could be patched back up.  And the cabinet under the sink upstairs needed to be opened on one side so that the pipe could be accessed as well.  
This was not going to be cheap by any stretch of the imagination.

What they found, rather than a pinprick of a corroded hole in the pipe that went all the way up to the room, was a 12 inch long crack. Inside that pipe, there was sludge that filled most of the diameter and explained why the sink had never drained very well...
For fun, I asked "That couldn't have been patched, could it?"  
They just looked at me in amazement.  Or maybe amusement.

So, 8 hours later, the cast iron pipe had been cut and removed (with metal dust all over the bathroom and the sheets covering things in our bedroom).  And a shiny new PVC pipe was in it's place, no leaks, no sludge hidden inside of the gleaming white newness.

Enter Handyman Jeff (yes, our own Jeff).  Lights had to be replaced in the area under the new PVC pipe, and he took care of that before the drywall would be replaced.

Re-enter Contractor Jim.  His job now was to rebuild the cabinet under the sink and the right-angle cover that housed the upright pipe in the bathroom, and put up new drywall.  Over the course of this week, he plastered, sanded, plastered again, primed, vacuumed, until he was satisfied that everything was in the best shape it could be in.  

Our job now is to paint that section and possibly put bookshelves there, under the lights that now work (for 4 years, the lights which were installed there had been unsafe to operate, so we had done without!)

The job isn't done yet, but at least there is no longer danger of the whole soggy section coming down on us while we rest peacefully after a hard days' work!

And a couple of unexpected bonuses:
Besides lights that work, we discovered what the mystery switch on the bedroom wall was for:  the light outside, on the northeast corner of the house.
Jeff rewired the entire switch, so that we can safely use the new lights, but so that that is a separate switch for the outside light.
We no longer need to plug that switch into the outlet housed inside the closet.  (That always seemed to be a strange solution).
We discovered what the walls were decorated with, at least 20 years ago (a date written on a 2x4 stud was October 1993).  
-The bathroom upstairs was sponge-painted:  White background with silver, gray, and a tan sponged over the top.
-The bedroom also was sponge-painted at some point:  Rose colored paint with mauve sponged over it.  
-Even earlier than that, when the cast iron pipe was first put in, there was a thin 1/4" layer of plaster on the walls.  Most of the wood strip and plaster walls throughout the house have been replaced with drywall, but behind the bathroom corner and out into the upstairs hallway, there was still the old style wall left intact behind the newer drywall.  
-And in the bedroom, behind the cast iron pipe, chewed by mice and somewhat moldy, was what remained of a creamy white wallpaper with rose medallions printed on it in raised ink, and a 2" pastel border which would have been at the top of the wall.  That probably dates back to when our bedroom was the "parlor", where the front door opened into what is now the closet, and when there was a wood burning stove in the northeast corner (a built-in closet is there now).  The pipe would have been installed in front of it when the 2nd floor bathrooms were being installed in what used to be attic/sleeping space in these old houses.  The plumbers estimated that the pipe had been there since the 1950's.  

Interesting bits of this house's history, and every bit a part of this adventure as the inevitable repairs that will keep cropping up.